Chick-fil-A Beavercreek, OH — Reinvestment & Renovation Project

Woodbine Construction undertook a substantial reinvestment and renovation project at Chick-fil-A’s standalone restaurant in Beavercreek, Ohio. Work included a dual-lane drive-thru canopy, building expansion, structural and finish upgrades, new kitchen and back-of-house installations, and more — resulting in an updated, modern restaurant facility aligned with current operational and customer-experience needs.

 

This case study outlines the project’s challenge, objectives, solution, and outcomes — and demonstrates Woodbine’s competence in delivering full-scale restaurant renovation, reinforcing their authority and trustworthiness in the hospitality construction sector.


The Challenge

  • The existing Beavercreek Chick-fil-A — a 17-year-old facility — was operating beyond its original capacity, with increased drive-thru demand and evolving customer expectations.

  • The restaurant layout and infrastructure no longer met modern throughput requirements: kitchen space and drive-thru capacity were insufficient, leading to delays and constrained service.

  • The existing facility needed a comprehensive update: structural, mechanical, interior finishes, and service flow improvements — while minimizing downtime and disruption.


Objectives

Woodbine Construction worked with the restaurant owner’s team with the following goals:

  • Expand building footprint to create adequate kitchen and back-of-house space

  • Add a dual-lane drive-thru canopy to accommodate high drive-thru volume and improve throughput

  • Upgrade all structural, masonry, concrete, roofing, and interior systems (including freezer/cooler, custom millwork, flooring, and finishes)

  • Modernize the dining and service areas for improved customer experience and efficient operations

  • Complete renovations effectively to allow timely reopening and minimize negative impact on business

Solution & Execution

Woodbine’s renovation plan addressed all critical elements:

  • Constructed a dual-lane canopy for the drive-thru to enhance capacity and service speed.

  • Executed a building addition, expanding kitchen/back-of-house, storage, and service areas.

  • Completed structural work including concrete and masonry as needed for the expansion and renovation.

  • Upgraded interior finishes, flooring, roofing, custom millwork, and installed new kitchen equipment including freezer/cooler and service doors (bi-parting quick-serve door).

  • Overhauled back-of-house areas, ensuring compliance with modern standards for food service, storage, and workflow.

  • Managed project efficiently to support reopening: the facility closed for renovation and reopened after renovation around mid-July 2024.


Results & Impact

  • The renovated restaurant now supports much higher drive-thru throughput and kitchen capacity — improving service speed and customer satisfaction.

  • Updated, modern interiors and finishes enhance the dining experience and align the location with current brand standards for aesthetic and functionality.

  • The dual-lane drive-thru and expanded kitchen/back-of-house allow Chick-fil-A to better accommodate increased customer demand.

  • The remodel demonstrates Woodbine Construction's ability to handle full-service restaurant upgrades — from structural and civil work to interior finishes and kitchen outfitting — establishing reliability and expertise in hospitality construction.
December 10, 2025
Woodbine Construction transformed Owl Creek Country Club into a premier recreation and leisure destination. The renovation included building a new L-shaped, 25-meter competition pool with diving boards, adding a poolside snack bar, and constructing an elevated observation deck. Combined with the club’s existing tennis and pickleball courts, the upgrades significantly enhanced the member experience — offering improved swimming, social, and community amenities.